Primary En Suite Remodel

EVERGREEN LANE, PLYMOUTH

PARTNERS

Contractor | Beardsley Built

Cabinetry | Artistic Visions

SPACE
330 sq. ft.

CONSTRUCTION
3 months

AGE OF HOME
1995

PROJECT DETAILS

As the final phase of their whole-home remodel, the primary suite was well worth the wait. The original layout felt more like a dated hotel, with a separate vanity and an oversized bedroom out of proportion with the bath. By relocating the entrance to the closet and bathroom, we expanded the bath and elevated the finishes throughout. The result is a tailored, serene retreat that now aligns beautifully with the rest of the home.

  • New layout achieved by door relocation and stealing a foot from bedroom

  • Cambria surround in shower to be stunning but also easy to clean

  • Expanded counter space and increased storage

Client Experience

SPECIAL FEATURES

✓ Changed entry from middle to side to expand bathroom

✓ Entire shower surround is Cambria to create seamless and elegant look

✓ Added light trough at back to feature pattern grain

KIND WORDS

She worked closely with the contractors to ensure everyone was on the same page, and she learned from them what could or could not be done.

It was a pleasure working with Jess on our bedroom and bathroom remodel. While we contemplated for years on how to rearrange awkward walls, Jess used a software program which quickly allowed us to visualize her space-saving ideas. After listening to our wants and decor aesthetic, she brought us options as the project progressed. Our next ah hah moment was our one visit to a tile shop - she walked us through the overwhelming options and when she saw us both agree on a tile, she added it to her software (while in the store), then added paint color, lighting, mirror etc for effect - the whole room came together right there. Jess is a strong professional, highly organized, creative and a pleasure to have in our home.

- Sherry & Dan P.